
How lime works in the BOS process
BOS steelmaking is fast. A typical blow lasts around 15 to 20 minutes, during which oxygen is lanced into the molten iron charge to oxidise carbon, silicon, manganese and phosphorus. Quicklime is added early in the blow to combine with silica and phosphorus oxides, forming a basic slag that floats to the surface and can be tapped off separately from the steel.
Because the reaction window is so short, the lime added has to dissolve and react quickly. Slow-dissolving lime means phosphorus and sulphur removal is incomplete by the time the blow ends, which risks off-specification steel, rework or downgrading. This is why reactivity, not just CaO content, is such a critical property of BOS-grade lime.

Why purity matters at this stage
Three properties of quicklime have the greatest bearing on BOS performance:
- Available CaO content. Higher available lime means less tonnage needed to hit target slag basicity, reducing both material cost and slag volume for disposal.
- Reactivity. Soft to medium-burned lime dissolves fast enough to keep pace with a short blow cycle, supporting efficient dephosphorisation and desulphurisation.
- Low residual CO2 and silica. Under-calcined lime carries unreacted limestone that doesn’t contribute to slag formation, while excess silica works against the basicity you’re trying to achieve.
Variability in any of these properties between deliveries forces operators to over-specify flux additions as a safety margin, adding cost and increasing slag volume without improving process control.
Pre-treatment and desulphurisation
Ahead of the BOS vessel, our fine ground Calbux Flowfine quicklime is used in hot metal desulphurisation, typically injected with magnesium or aluminium powder to strip sulphur from the iron before it reaches the converter. Removing sulphur at this stage reduces the burden on the BOS process and gives steelmakers more control over final sulphur specification, which matters for grades with tight sulphur limits.
